1) Worked as a subcontractor of MPE for SSDC.

At this project there was one office building, Guard Room, over head tank , sewer work, sanitary work Bore well, Inside 6 shed and Fencing 3 KM work. Time period for this work was one year. At this work there was stone cladding more than 3000 Sqm area. The scope included the drilling of Bore well for nearly 100m depth and the construction of over hear tank 6m height inside sanitary pipe length 3KM. All cost for work was more than 100,000 R.O.

2) Worked for the Ministry of Environment and Affairs at Marbat.

At this project there was one office building, Guard Room, over head tank , sewer work, sanitary work Bore well, Inside 6 shed and Fencing 3 KM work. Time period for this work was one year. At this work there was stone cladding more than 3000 Sqm area. The scope included the drilling of Bore well for nearly 100m depth and the construction of over hear tank 6m height inside sanitary pipe length 3KM. All cost for work was more than 100,000 R.O.

3) Working with Wara Construction Co. at Salalah.

We worked with them at salalah Mall for Sewer Pipe Line, Riprape, Interlock and some civil works. At this project our main work was for internal sewer line and Strom water drainage pipe line. We finished it at a 6 months period. The scope also had 2 Greece Trap for Sewer Pipe line. The cost for all works was nearly 120000 R.O.

4) Installation of plumbing and Drainage service for SSDC Chairman (HE’s) House.

We worked for sewer pipe line at SSDC Chairman House. The scope was for pipe line trenches and chambers work. We already finished this work under his supervision and we were appreciated for our works.

5) Construction of Residential Building at Salalah.

More than 9 Private houses have been constructed along with all the material in this project. Three House were at Saadah, Two at new Salalah, and one at Sanaya Jadeeda.

Other Projects

  1. Construction of water tanker cum Pumping station at Ibri through P.A.E.W CONTRACTOR
  2. CONSTRUCTION OF STP (SEWERAGE TREATED PLANT) MAIN CONTRACTOR(GALFAR ENGINEERING S.A.O.G)
  3. Construction of H’E Shaik Salem Villah.
  4. Construction of Residential & Commercial Multi-storied buildings at North-Aquad for Shaik.Mohammed Al Rawas. Commercial complex building at Al Hussaila.
  5. Residential and Commercial building at Al saadah.
  6. Installation of Electrical Towers at Zeek Client : DCP
  7. Civil Works and Wadi Protection for cabling Duct at Wadi Darbat.
  8. Construction of work shop and Yard at Salalah port.
  9. Construction of irrigation storage tank, Dhofar Municipality.
  10. subcontractor works for civil works for WRP-Phase 2 at Raysut, Client : SSDC
  11. Main pipeline Subcontract for MPE for the main Sewer Line network for pahse-2 at WRP. Subcontractor for Extension of network at Al-Sadah , Client : SSDS.
  12. Civil works for steel structure roofing works for central store in WRP,Salalah.
  13. Subcontractor of ONEC & GEC for electro mechanical works for Sewage networks.
  14. House Connection works for Salalah Network of SSDC in and Around Salalah.
  15. Subcontractor of Galfar for the Operation & Maintenance of Irrigation & Sewage network at Salalah, Client SSDC. Waste Disposal of WRP of SSDC to Dumping yard.

Road Projects

ROAD PROJECTS DONE IN ASSOICIATE WITH THE MAIN CONTRACTOR FOR THE FOLLOWING ROAD WORKS.
  1. 2011 SALALAH BEACH PROJECT : Excavation of part of the Laguna ,the prestigious waterways in The Salalah Beach project, between Salalah and Taqah.Client: ORASCOM , Value of the project :400,000 RO
  2. 2012 NEW SALALAH FREEZONE – ADHAN LANDLeveling of 2,700,000m2 of land in the first phase of the proposed New Salalah Free zone, at the Adhan Land area, opposite The Hilton Hotel in Salalah. Client: Salalah Free zone Company, SAOG Value of the project:: RO 1,200,000
  3. 2013 ROTANA HOTEL PREPARE ROADS PROJECT: Embankment Filling& Sub grade, sub base, Construction works. Preparing road from Original ground level to sub base top layers bay layers as per specification of consultant . Provide mixing material, compaction, etc.Client: Taqah Hotel Management LLC. Value of the Sub contract: – 1, 20000 OMR.
  4. Client: salalah free zone Value of the Project: – 631,361.000 omrEarthwork working, clearing and grubbing unclassified excavation, Excavation of unstable material outside row , sub grad preparation in cut drainage , storm water drainage
  5. Client: Muscat of Ministry. Value of the project: 240,000.000 RO.5. 2015 UPG.RADINGOF SINAWMAHOUT-DUQM : Embankment Filling & Sub grade Construction works
  6. Client: SSDC .6. Sub-contracting works for the internal roads and settlements and asphalt and road woks for Galfar Contracting SAOG for the Salalah Sewage network,
  7. Internal Roads in WRP and STP for Galfar & SSDC.
  8. Asphalt roads and settlement works in and around Salalah .